Astronauts Won't Be Flying To Space In Boeing's Starliner Until 2018 (theverge.com)
An anonymous reader writes: The Boeing Starliner, one of two new spacecraft meant to break the Russian stranglehold on sending people to orbit, has hit a snag. Originally scheduled to start flying next year, the Starliner won't carry a crewed mission to the International Space Station until 2018 at the earliest. Six years is long enough. Ever since the 2011 retirement of the space shuttle NASA has been pushing for privately built craft capable of ferrying astronauts to orbit, which would let the agency buy American-made ships and end its dependency on renting seats aboard Russian spacecraft. The Starliner and SpaceX's Dragon were chosen, and 2017 was to be the year. But while SpaceX has sent its ship to the ISS on multiple uncrewed cargo resupply missions, the Starliner won't make such trips until 2017 and won't carry people until 2018 at the earliest. SpaceX maintains that it will be able to send crews to orbit in 2017.GeekWire explains: "For Boeing to shift its crewed test flight from 2017 to 2018 isn't as much of a slip as it might sound: The company's earlier schedule had called for the visit to the space station to take place in mid-December."
It's not really american when the Atlas V, the rocket which this capsule ist built for, still uses russian RD-180 rocket motors. A rocket is a fuel tank and a rocket motor mostly. It's not the fuel tank that's hard to build....
FTFS:
SpaceX has sent its ship to the ISS on multiple uncrewed cargo resupply missions
To be fair, the Dragon that SpaceX has flown is a very different vehicle than the Dragon V2, which is the capsule rated to carry astronauts. So while they do have a leg up on Boeing in some respects (and will likely beat them on schedule) neither capsule is really flight-proven at this point.
Assuming it doesn't get pushed back again.
SJW's don't eliminate discrimination. They just expropriate it for themselves.
Although we proved it in the 60's, this stuff is hard. You've now got private companies competing, not cooperating via NASA to deliver this stuff.
The problem here is our federal government hot cancel contracts and retire heavy lifting vehicles. Frankly, the shuttles were not in immediate need of retirement. Endeavour, the newest, was built in '92 and could have been kept in rotation until there was a viable American-controlled alternative.
In the Reagan administration, the USS Iowa and Missouri were pulled out of mothballs to patrol the Strait of Hormuz. In fact, the USS Missouri served longer in this second period than it did in its maiden one.
To Copy from One is Plagiarism; To Copy from Many is Research.
Falcon Heavy was deliberately pushed back because upgrades to the Falcon 9 increased its payload to the lower end of Heavy's original design, resulting in a lower cost launch in those paylaod ranges. Basically there was no point to rushing the Heavy because there wouldn't have been an immediate market for it. Sure, there was some slippage just because reasons, but much of the delay was of the "oh wait, we don't need that right now after all" type.
Russia does not have a stranglehold; like they are preventing others from doing so. The US has dropped the ball, which is shameful.
I would expect that the speed at which they get to Falcon 9 reuse would have an impact on the Falcon Heavy schedule (that speed, in turn, being relative to the rate that they keep landing them - the more they have on hand, the more risky they can afford to be in their return-to-flight testing program for them). Falcon 9 and Falcon Heavy cores are extremely similar and made on the same lines, and the engines are identical. So the more line capacity they free up, the more they can dedicate toward the Heavy.
Monkeywrench Ex Machina.
I'm OK with aggressive deadlines that get pushed out. Aggressive time lines presses a team to be as productive as possible. On the other hand, the courage to delay when its not ready regardless of the financial consequences is in my mind to be admired.
This is what differentiates a quality organization from those stock market driven pointy haired managed fiascoes all to common in business today.
Greed is the root of all evil.
I'm OK with aggressive deadlines that get pushed out. Aggressive time lines presses a team to be as productive as possible.
Until it becomes a de facto expectation that you won't meet the deadlines and they'll be pushed out anyway because they were some PMs wet dream. Then it becomes a self-fulfilling prophecy that if you want it in three weeks you set the deadline to three days, because nothing will really happen until you start raising a stink about how late it is while the project that actually schedules three weeks waits three months instead. And as a consequence of the schedules being unrealistic, there's no real retrospective done with the PMs on the missed estimates because everybody more or less knew they were imaginary anyway. Overly aggressive deadlines are a sympton of dysfunction, not productivity.