I have run a Sharp AV18 (1.0Ghz, 768 RAM, 20Gig HD) with Xubuntu since 6.06 came out. Sharp made a great little box and this one has a CD recorder/DVD drive.
I did this a while back, the trick is some machines are 24/7 others are 9-5 ers. I coordinated with dept heads to identify what entire departments could be shut down then scripted a prompt to fire at 7:00pm to look for any user feedback, working late crowd, then 30 minutes later do a shutdown if no response was received. This took care of most machines. I never got to the mixed departments, greener pastures called.
yep. Oh thats one for me too.
Ditto, sold my iphone 3g as soon as my e71 arrived. I LOVE this phone.
Between heat and current I am guessing your pics won't last 25 seconds.
I have run a Sharp AV18 (1.0Ghz, 768 RAM, 20Gig HD) with Xubuntu since 6.06 came out. Sharp made a great little box and this one has a CD recorder/DVD drive.
I did this a while back, the trick is some machines are 24/7 others are 9-5 ers. I coordinated with dept heads to identify what entire departments could be shut down then scripted a prompt to fire at 7:00pm to look for any user feedback, working late crowd, then 30 minutes later do a shutdown if no response was received. This took care of most machines. I never got to the mixed departments, greener pastures called.
one more for the list, Linksys NAS200 http://www.cdw.com/shop/products/default.aspx?EDC=1262189/