Slashdot Mirror


X-Prize Progress Update

savuporo writes "The X-Prize organization has released a summary document (PDF), detailing the recent progress and immediate plans of 13 different competing teams, of those who have publicised information of significant hardware development (there are a total of 27 officially listed competitors from seven nations by now). Some details: quite a few teams are expecting to do full-scale or subscale powered flight tests soon, some as early as January 2004. Burt Rutan can still be considered as leading the pack, but others are not too far behind, and the winner is far from certain. Armadillo Aerospace states that some US teams are hindered more by regulatory hassles, than technical issues. Speaking of Armadillo, the team has just released a very special video, commemorating tomorrow's 100th anniversary of powered flight."

7 of 154 comments (clear)

  1. Looking Forward to 2004 (pdf articles text) by glassesmonkey · · Score: 5, Informative


    TEAM: SCALED COMPOSITES
    WEBSITE: WWW.SCALED.COM
    TEAM LEADER: BURT RUTAN

    It is expected that the next six to nine months will involve a number of rocket powered flights of SpaceShipOne, with each flight involving a longer and longer burn of the hybrid engine. The first flight may be limited to a short 15- second burn, with later flights demonstrating the full 60+ second burn time bringing SpaceShipOne from 50,000 feet eventually to an altitude of 328,000 feet (62 miles...space!).


    TEAM: ARMADILLO AEROSPACE
    WEBSITE: WWW.ARMADILLOAEROSPACE.COM
    TEAM LEADER: JOHN CARMAC

    Immediately after completion of the engine test program, Armadillo will be testing a full scale boilerplate X PRIZE vehicle with a captive hover test at their 100-acre test facility, followed by some low altitude hover tests to 3,000 ft. With these tests completed, it's their intent to do some additional low altitude launches within the "amateur" classification (and they continue to work with FAA AST for a burn time waiver). The next phase of successively higher altitude tests and ultimately manned X PRIZE flights will be dependent on what the team calls its biggest challenge: the launch license application and accompanying environmental review. Technically, Armadillo claims they will be ready to fly X PRIZE missions well before the end of the year, but Team members are fond of referring to the Wernher von Braun quote: "We can lick gravity, but sometimes the paperwork is overwhelming." Challenges included, this Dallas based group of bicycle repair mechanics is relishing the prospect of an exciting 2004.


    TEAM: STARCHASER INDUSTRIES
    WEBSITE: WWW.STARCHASER.CO.UK
    TEAM LEADER: STEVE BENNETT

    With the Thunderstar and its new engines now in production, Starchaser plans to fly in 2004. The team has also announced that it will make its propulsion system available for sale to other X PRIZE contestants on a commercial basis.


    TEAM: CANADIAN ARROW
    WEBSITE: WWW.CANADIANARROW.COM
    TEAM LEADER: GEOFF SHEERIN

    Next steps for the team will include continued testing of the engine to prepare it for actual flight onboard the first Canadian Arrow spacecraft that is scheduled for launch next year. When successful, the Arrow will make Canada the fourth nation to put humans into space.


    TEAM: DA VINCI PROJECT
    WEBSITE: WWW.DAVINCIPROJECT.COM
    TEAM LEADER: BRIAN FEENEY

    Da Vinci Project celebrated the 100th anniversary of powered flight with a Technical conference and press evening on December 16th & 17th. Early in 2004 da Vinci Project hopes to receive its license to launch from the Canadian Government and begin a sequence of test flights culminating in an series of flights to win the X PRIZE.


    TEAM: PABLO DE LEON & ASSOCIATES
    WEBSITE: WWW.PABLODELEON.COM
    TEAM LEADER: PABLO DE LEON

    During 2004 we will concentrate in launch test of at least two half scale vehicles and in launch operations. Several hybrid static firing tests will also be performed. Construction of a full scale capsule will begin in July 2004. This capsule will be used for training, simulation and to study mating/demating techniques.


    TEAM: HIGH ALTITUDE RESEARCH CORP. (HARC)
    WEBSITE: WWW.HARCSPACE.COM
    TEAM LEADER: TIM PICKENS

    HARC will continue progressing toward full scale launches while keeping safety first. Hardware design and testing will continue into 2004 with a launch of the Liberator Escape Tower and Capsule in the 1st half of 2004. HARC is planning for a summer launch of the "Little Joe" version of the Liberator to an altitude of approximately 40 kilometers. The first full scale launch is planned for late summer and will be followed by another launch in the fall. The two X PRIZE competition flights will take place in late 2004, and there are already astronaut candidates pitching in to help move the Team toward that goal.


    T

  2. Blam! by i_am_syco · · Score: 5, Funny

    I'm still wondering whether John Carmack's ship is going to have a BFG 9000 on it or not.

  3. This is what's needed by Cap'nMike · · Score: 5, Insightful

    to get commercial space exploration started. As long as NASA is the only serious space agency, progress will be slow and safe. By letting individuals and small groups take risks that NASA is unwilling or unable to take, progress can be expected much sooner. The same thing has been seen throughout history as individuals willing to take risks have always surpassed massive, slow, cautious exploration by governments.

    --
    Celebrities are like ads, if we all ignore them, they'll just go away.
  4. Re:Makes you wonder by pinchhazard · · Score: 5, Funny

    It really makes one wonder where we would be if Goddard had restrictions on fuel sources and flight space or even where the Wright Bros. would be if they had to constantly check with local authorities every time they wanted to make a flight.

    The Wright Brothers would be in the same place now regardless of the governmental regulations of 1903. Unless inventing airplanes is a condition for getting into heaven.

    --
    Do you love freedom??? Do you love freedom!!! DO YOU LOVE FREEDOM!!!!!!!!
  5. Mmm.../. cache by NewWaveNet · · Score: 5, Informative

    Armadillo Videos

    windows media
    quicktime
    mpeg

  6. Rutan is ready to flight-test the rocket motor by Bruce+Perens · · Score: 5, Interesting
    I've been following the test updates on the Scaled Composites site. It looks as if they are ready to flight-test the rocket motor. On the last flight, they tested the entire propulsion system with nitrogen flow. It sounds to me as if they could be ready to fire on the very next test flight.

    I guess the first firings would be short, and would be designed to test the vehicle in the powered and high-speed-glide speed and dynamics envelopes rather than the lower-speed glide one which is now reasonably well characterized.

    This is all very exciting.

    Bruce

  7. We aren't being held up by regulatory issues. by John+Carmack · · Score: 5, Informative


    We have a good working relationship with AST, the division of the FAA that handles launch license, and we are one of only three companies (along with Scaled and XCOR) currently in the RLV launch license process. We have found all the people there helpful and eager to work with us. There is a lot of paperwork to be done, but we are working through it, and do not see a problem satisfying them. Things like calculating and minimizing expected third party casualty rates are obviously necessary and sensible.

    The environmental aspects are less rational, with no analytical sense of scale.

    Still, I'm only mildly concerned about the regulatory side of things. I think it will work out. None of our work is held up by any of this, so the worst case is that we have a vehicle built and tested repeatedly at the 200,000 lb-sec waivered impulse limit, with no launch license to allow us to fill the tank the rest of the way up. If that happens, THEN we get peeved about the situation, but continue flight testing with what we can.

    Let me repeat: In no way have we been hampered by regulatory burden. Yet. We have been VERY hampered by commercial companies being too worried about liability exposure to work with us - peroxide companies, filament winders, and parachute companies have all caused us significant problems.

    The supply issue with 90% peroxide basically cost us almost the entire year of flight testing. We spent the last six months developing a propellant combination that could conveniently replace the 90% peroxide based on widely available chemicals instead of the ultra-specialized propulsion grade. We are in the final optimizing and scale up phase of that. Instead of being irate about it, I try to look on the bright side - it is lots cheaper, easer to handle, and even a bit higher performance.

    There are lots of problems still to be worked, but everything is coming along fine. We are behind schedule and somewhat over budget, but no worse off than any other project I have ever worked on...

    John Carmack