NASA's Orbiting Carbon Observatory Mission Fails

jw3 writes "The NASA Orbiting Carbon Observatory scheduled for launch today has failed its mission: the payload fairing failed to separate and the launch managers declared a contingency. George Diller, NASA launch commentator, said, 'It either did not separate or did not separate in the way that it should, but at any rate we're still trying to evaluate exactly what the status of the spacecraft is at this point.'" Update: 02/24 14:17 GMT by T : Reader fadethepolice points out a Reuters report which says that the craft crashed into the ocean just short of Antarctica.

13 of 325 comments (clear)

  1. Global Warming by Anonymous Coward · · Score: 5, Funny

    is a hoax, and the rocket knows it was just wasting time and money. It threw the launch.

  2. Fantastic! by The+Fun+Guy · · Score: 5, Funny

    The telemetry from the satellite is reading zero across the board. That must mean there's no carbon dioxide in the atmosphere anymore. Now we don't have to worry about global warming - fantastic!

    Good work, NASA. I knew we could get this climate change thing cleared up once we had better data.

    --
    The man who does not read good books has no advantage over the man who cannot read them. - Mark Twain
  3. Taurus XL by JumboMessiah · · Score: 5, Interesting

    Was the decision to use the Taurus to keep launch costs down? Launching from Vandenberg, I'm assuming they were aiming for a steep inclination. Just wondering if anyone knows why they didn't go with a Delta II....

    1. Re:Taurus XL by drinkypoo · · Score: 5, Funny

      Seems more like they used a Taurus. If one of those gets where it's going, it's a miracle.

      --
      "You're right," Fisheye says. "I should have set it on 'whip' or 'chop.'"
  4. well we're f*****d by wisebabo · · Score: 5, Informative

    This probe would have provided millions of carbon dioxide measurements a day* for the entire atmospheric column (rather than the hundreds of measurements, usually only at ground level that we currently get from our fixed sensors). Considering the importance these measurements would be in helping us predict climate change, I think we (the human race) has just suffered a serious setback.

    [There was a scene in the movie "Silent Running" where the command is given to jettison and detonate the last remaining biospheres. The commander says "may god have mercy on us". I'm beginning to feel that way now.]

    *it was going to take readings at 56,000 locations a day but at each location would record carbon dioxide concentrations for the entire air column.

    1. Re:well we're f*****d by tpheiska · · Score: 5, Funny

      So we lost a machine that would have given us concrete evidence on the *possible* increase in carbon dioxide concentrations in the atmosphere. And now NASA lost it even though they haven't lost an earth orbit bound spacecraft in a while. Let me get my tinfoil hat.

      --
      "wahts woring iwth my tyoping?"
    2. Re:well we're f*****d by wisebabo · · Score: 5, Insightful

      You're absolutely right when you say that Science isn't about voting on truth. Best example I can think of plate tectonics; the guy who promoted that was derided as a loony because "continents don't move".

      But then a funny thing happened. More and more data came up to support him. First the fossil similarities on both sides of the atlantic. Then the mid atlantic ridge. Finally, if it wasn't already proven in almost all geologists minds, they found the active spreading.

      That's the thing about science. Sure you might be the underdog but the "truth" will win out in the end. It has to, because nature is always right. The problem with this Spencer guy (sorry, never heard of him) is that with more and more data being collected (alas not from the OCO) there are more and more climatologists believing in man-made warming. No good scientist will say they are 100% certain (look at the ICC report, it is all in probabilities) on such a complex issue but it is apparent that the evidence is getting stronger not weaker. Again, maybe Spencer is a genius but he'll have to prove it. If he does, he'll be famous like the guy who came up with tectonic drift ("I" don't know his name but I'm sure just about every geologist does!).

      Actually it's funny that you mentioned Spencer. I followed the Wikipedia link and briefly skimmed his bio. You mention that the last two paragraphs of what I wrote is "Not relevant". After reading Spencer's bio it's so relevant it's funny! I was going to say that everybody has an opinion and sometimes that opinion can't be changed by facts no matter how strong. That's called BELIEF. Without reading Spencer's bio an inch further, I'll bet you he's some sort of fundamentalist or born again Christian. Why? Because he's got all this evidence staring him in the face on global warming (and supposedly evolution) and he draws the opposite conclusion that 95% of his colleagues do. YOU CAN'T CHANGE SOMEONE'S MIND IF IT'S CLOSED. So I have to thank you, you've proved that my last two paragraphs are Very relevant!

  5. Re:NASA Satellite lands in ocean by ruin20 · · Score: 5, Funny

    So this means that in the battle against climate change, the biggest shot NASA has taken thus far is a rocket attack on Antarctica.

    --
    Oh honey look... How cute... an angry slashdotter!
  6. Re:Rebuild? by jnik · · Score: 5, Interesting

    Satellites are usually built in pairs just in case one of them fails during launch
    Not usually...at least none of the NASA or AFRL projects I'm familiar with has a full-build spare. It's not entirely uncommon to have a second of some of the instruments, and it's pretty common to have enough spare parts to build another copy of an instrument. (Much easier to buy a couple of spares up front rather than wait around if someone screws something up.) Then testing and integration can go much more quickly and cheaply, having done it once before. It still can take awhile, though.

    (Incidentally, the title and summary for this article suck...the OCO didn't fail, it was lost in a launch failure, and it didn't "fail its mission," it didn't get a chance to start. That's like saying your car broke down because someone ran a red light and T-boned it. No offense intended to the launch team.)

  7. Re:What's the contingency for these missions? by kestasjk · · Score: 5, Informative

    On second thought, maybe they should tack on a year for design refinements and take a look at that whole separation module thingy.

    The team that designed the satellite didn't design the rocket. The rocket was a "Taurus XL", built by a different team to the OCO team (not even by NASA).

    I imagine less than 7 years went into the rocket's design, and that it cost much less than $270 million, so I would guess the team behind the satellite would be pretty damn pissed. (I wonder if they insure it etc, and what sort of rates they have to pay to do so)

    At any rate it's a real tragedy for everyone; knowing much more about where CO2 comes from and goes would have been a huge leap forward for the study of global warming.

    --
    // MD_Update(&m,buf,j);
  8. Re:What's the contingency for these missions? by Civil_Disobedient · · Score: 5, Insightful

    the builders were saying how much easier it would be to build a second one, now that all the design work was done and they have experience putting it together

    First rule in government spending: why build one when you can have two at twice the price? -S.R. Hadden

  9. Re:NASA Satellite lands in ocean by ashitaka · · Score: 5, Funny

    An ICBM is what happens when you take a shit outside in Antarctica.

    --
    If you don't want to repeat the past, stop living in it.
  10. Re:What's the contingency for these missions? by bughunter · · Score: 5, Informative

    I worked on the instrument team for OCO from 1999-2004, and on similar instruments in the past. Yes, it is much easier to build another, but unfortunately, it's not really that much cheaper from a mission point of view, since the launch vehicle and satellite buss are a large fraction of the cost, and most of that is already incremental cost, not NRE. Usually, NASA considers the risk of launch failure and requires contractors to keep records adequate to build another on an incremental basis.

    One other cost factor is the ground segment -- the mission operations center and the data analysis facility. As I understood it five years ago, there were plans to build a rather large data center to crunch all the spectrometry data that OCO would have sent down. That didn't get sunk to the bottom of the ocean.

    And while I don't think anyone is "pissed," the mission and instrument teams are probably quite dejected. Especially Dr. Crisp, the principal investigator. That was his baby.

    There is a good chance that NASA may still "do it over" however, 1) because of the reduced "incremental" cost, and 2) to support Pres. Obama's environmental policy.

    --