NASA Pitches Heavy Lift Vehicle To Congress
BJ_Covert_Action writes "Well, Congress demanded, last year, that NASA develop a budget plan and proposal for a new heavy lift vehicle in light of the Ares V cancellation. Recently, NASA gave Congress just what they wanted. On January 11th, Douglas Cooke pitched an interim report to Congressional members detailing the basic design concepts that would go into a new heavy lift vehicle. Congress required that the new heavy lift vehicle maximize the reuse of space shuttle components as part of its budget battle with President Obama last year. As a result, NASA basically copy-pasted the Ares V design into a new report and pitched it to Congress on the 11th. The proposed vehicle will require the five segment SRB's that were proposed for the Ares V rocket. It will utilize the SSME's for it's main liquid stage. It will reuse the shuttle external tank as the primary core for the liquid booster (the same tank design that is currently giving the Discovery shuttle launch so many problems). And it will utilize the new J-2X engine that NASA has been developing for the Ares V project as an upper stage. In other words, NASA proposed to Congress exactly what Congress asked for."
* Congress demands new Moon program
* Nasa dusts off old plans, calls it Ares V
* Congress cancels Ares program
* Congress asks for new heavy lift vehicle
* Nasa hands them the plans for Ares 5
Man, talk about recycling...
There's no -1 for "I don't get it."
Letting Congress pick rocket components is equivalent to me (colorblind) pick out the paint scheme for my house. Both will end in amazing disasters...
Fast, cheap, correct. You get to pick two.
The editors took the second paragraph of my summary out. They probably thought it was a bit too tasteless, or something, despite the important information in it. Here it is (also from the article linked):
The catch is, NASA also admitted that they will not be able to complete the proposed rocket on the budget that Congress has given them. Neither will they be able to finish the rocket on time. Finally, NASA has commented that a current study being conducted by 13 independent contractors is still being conducted to determine if there is a better design out there that NASA has, 'overlooked.' NASA has stated that, should that study finds any alternate, interesting designs then, they will need to consider those seriously."
Motorcycles, Robots, Space Gossip and More!
Sounds more like corporate welfare then science to me.
Let's just ask Elon what a Falcon XX will cost instead.
This is basically the Jupiter Direct program advocated by quite a few insiders at NASA. It was designed by some NASA engineers moonlighting. So, this isn't some half-baked scheme by Congress to try to engineer something themselves. I didn't look at these final details, but it does sound like they added more SRB's than originally planned.
For more information, see the wikipedia entry:
http://en.wikipedia.org/wiki/DIRECT
----- obSig
Well, first off all the problem with discoveries tank is due to a manufacturing problem with the stringers, not a design flaw.
Second of all, why use SSME's? They are designed for re-use, and have restart capability that will not be needed. A better choice would be the rocketdyn's RS-68, single use, cheap as fuck, provides more lifting power.
Congress required that the new heavy lift vehicle maximize the reuse of space shuttle components as part of its budget battle with President Obama last year
So congress made engineering decisions for NASA. They told NASA to reuse some parts from something else. And does Congress even know if that actually saves money? There have been plenty of times I've been told to develop something and to reuse an existing piece of code, and I've had to disappoint someone by pointing out that reusing their old COBOL EXE does not actually shrink the timeline. :-( In mechanical engineering, I've learned that reusing parts often adds a lot of work.
Maybe that isn't the case here, but Congress should instead have set constraints and let NASA decide how best to implement it. No doubt the new request also tells them what vendors to use, and what state to by them from, and where to eat lunch so that the money gets spread around to their own pet projects.
SpaceX plan costs $1 Billion just to develop the Merlin 2 engines and "qualify" them on Falcon 9 rockets in 3 years. I assume by qualify they mean flight tested, I don't know if a Heavy Lift vehicle needs to be man-rated. Of course the Falcon 9 will have to be man rated to carry a Dragon capsule with crew onboard, so if qualify means man rated so much the better.
You have $9 Billion left to build the Rocket, and finish the Dragon capsule crew module version which is already funded.
Unlike Congress, a fence post has the wisdom to refrain from doing anything actively stupid.
the preceding comment is my own and in no way reflects the opinion of the Joint Chiefs of Staff